NEC Code Compliance
The NEC is revised on a three-year cycle, and citing the wrong edition on a permit document is a real, avoidable problem.
The National Electrical Code is revised on a three-year cycle, and — as with the PEC edition article elsewhere in this series — citing an outdated edition on permit documentation is a real, avoidable source of review delay.
Jurisdictions adopt a specific NEC edition into local law, often with local amendments layered on top — a jurisdiction might still be enforcing an older edition well after a newer one has been published nationally, or might have already adopted the newest edition ahead of some neighboring jurisdictions. There's no single universal "current" edition in force everywhere simultaneously.
See which edition each OhmWorks NEC data table references directly in the calculator results.
Engr. Jason Morales — Founder, SolarEnergyPH & OhmWorks